Beloit, August 18, 2025
News Summary
Construction on WIS 213 in Beloit is set to start, aiming to improve road conditions and upgrade accessibility features. The project will maintain traffic flow for most of its duration, with brief full closures planned for specific tasks. The Wisconsin Department of Transportation oversees the initiative, which includes pavement improvements and a new railroad crossing surface. Expected completion is scheduled for early to mid-fall, with detours provided during closures.
Beloit
Construction on WIS 213 in Beloit is set to commence on Monday, August 18. This project will span the section of WIS 213, also known as State Street, from the Illinois State Line to Broad Street.
The Wisconsin Department of Transportation (WisDOT) will oversee the construction, which aims to enhance the road’s pavement condition, upgrade curb ramps to align with current Americans with Disabilities Act (ADA) standards, and replace the railroad crossing surface along the route.
Throughout most of the construction period, WIS 213 will remain open to traffic. However, there will be two short full closures required for specific tasks: replacing the railroad crossing and for milling and paving activities. The exact dates for these closures have not yet been determined.
The official detour route during the closures will direct drivers from Broad Street to Illinois 75 and then to Blackhawk Blvd/State Street. While access to most intersections and businesses along WIS 213 will continue to be available, some temporary limitations may occur during the duration of the full closures.
The construction efforts are anticipated to be finished by early to mid-fall of this year. Residents and commuters are encouraged to stay updated on the progress of the project via the Wisconsin Department of Transportation website, where additional information and updates will be posted.
Project Objectives
- Improve pavement conditions: Ensuring a smoother, more durable surface for vehicles.
- Upgrade curb ramps: Bringing curb ramps up to ADA standards for enhanced accessibility.
- Replace railroad crossing: Installing a new crossing surface that includes updated signals for safety.
Construction Details
The project is designed to enhance safety and accessibility for all road users, especially those with disabilities. WisDOT is committed to minimizing disruption while completing these essential upgrades. Residents are advised to plan accordingly during construction to avoid delays.
Background Context
WIS 213 serves as a vital route in Beloit, facilitating travel into and out of the city. The anticipated improvements are not only aimed at providing safer passage for vehicles but also at supporting the needs of pedestrians and individuals with disabilities. Past assessments of the roadway indicated a necessity for repairs and modernization, prompting this significant project.
Contact Information
For ongoing updates on the construction schedule and progress, residents can visit the official Wisconsin Department of Transportation webpage. Public inquiries about the project can be directed to WisDOT officials through the contact details provided on their site.
FAQ
When does the construction on WIS 213 start?
Construction will begin on Monday, August 18.
What is the purpose of this construction project?
The project aims to improve pavement conditions, upgrade curb ramps for ADA accessibility, and replace the railroad crossing surface with signals.
Will WIS 213 be open during construction?
Yes, the road will remain open for the majority of the project, although there will be two short full closures for railroad crossing replacement and milling and paving.
What will be the detour route during the closures?
Drivers will be directed to use Broad Street to Illinois 75 to reach Blackhawk Blvd/State Street during the full closures.
How long is the construction expected to last?
The construction is expected to be completed by early to mid-fall.
Key Features of the Project
Feature | Description |
---|---|
Start Date | August 18 |
Location | WIS 213 from Illinois State Line to Broad Street |
Main Goals | Pavement improvement, curb ramp upgrades, railroad crossing replacement |
Closure Information | Two short full closures for specific tasks |
Expected Completion | Early to mid-fall |
Deeper Dive: News & Info About This Topic
HERE Resources
Additional Resources
- WIFR News: Construction to Begin on WIS 213
- Wikipedia: Transportation in Wisconsin
- WMTV 15 News: State Street Resurfacing
- Google Search: Beloit Road Construction
- Beloit Daily News: Highway 81 Resurfacing Discussion
- Encyclopedia Britannica: Road
- My Stateline: Wisconsin Man Killed in Highway Crash
- Google News: Beloit Construction Updates

Author: STAFF HERE PHILADELPHIA WRITER
PHILADELPHIA STAFF WRITER The PHILADELPHIA STAFF WRITER represents the experienced team at HEREPhiladelphia.com, your go-to source for actionable local news and information in Philadelphia, Philadelphia County, and beyond. Specializing in "news you can use," we cover essential topics like product reviews for personal and business needs, local business directories, politics, real estate trends, neighborhood insights, and state news affecting the area—with deep expertise drawn from years of dedicated reporting and strong community input, including local press releases and business updates. We deliver top reporting on high-value events such as Mummers Parade, Philadelphia Flower Show, and Thanksgiving Day Parade. Our coverage extends to key organizations like the Greater Philadelphia Chamber of Commerce and United Way of Greater Philadelphia, plus leading businesses in telecommunications, food services, and healthcare that power the local economy such as Comcast, Aramark, and Children's Hospital of Philadelphia. As part of the broader HERE network, we provide comprehensive, credible insights into Pennsylvania's dynamic landscape.